September 28, 2024

IBERDROLA
First wind turbine installed at Baltic Eagle offshore wind farm

May 17, 2024
Highlights The turbine is the first of 50 to be installed at 476 MW Baltic Eagle wind farm. A joint venture between Iberdrola and Masdar, Ba. . .

TO ACCESS THIS CONTENT
YOU MUST OPEN A SESSION OR CREATE AN ACCOUNT

Email*
Password*
Forgot your password?
Email*
More information