April 23, 2024

EFACEC AWARDED CONTRACT TO BUILD AND OPERATE A SOLAR POWER PLANT IN MOZAMBIQUE
Neoen and Electricidade de Moçambique select Efacec for the construction of Metoro Solar Power Plant

January 16, 2020
Efacec was selected for the engineering, procurement and construction (EPC), and operations and maintenance (O&M) of a 41 MWp solar plant, located in . . .

TO ACCESS THIS CONTENT
YOU MUST OPEN A SESSION OR CREATE AN ACCOUNT

Email*
Password*
Forgot your password?
Email*
More information