June 7, 2025
Electric Energy Jobs

Cable Splicer

Organization:
NextEra Energy, Inc.
Region:
United States, Florida, Hialeah
End of contest:
April 10, 2018
  This job posting has expired
Type:
Full time
Category:
Lineman
Description
Requisition ID:  10145

 

Our reliability is one of the best in the nation, and we're working to make it even better. We live here too. That's why we're committed to making Florida a better place. Join our team today

Position Specific Description

Florida Power & Light (FPL) is seeking certified cable splicers to join our growing team! To be successful in this role you must have the ability to work ANY SHIFT anywhere within FPL's service territory in Florida. If you are looking to take the next step in your career with a dedicated team, this could be the role for you!

SIGN ON BONUS AVAILABLE

Job Overview

Cable Splicer will be expected to perform all associated tasks with the construction and maintenance of all underground facilities. Must be able to trouble shoot and repair all underground distribution circuits and equipment. Cable Splicer may work alone or be assigned to work with other Splicers or lower classifications without the direct supervision of a higher level classification. Will be expected to safely perform all distribution underground switching and overhead switching as needed. May be required to work in inclement weather for extended hours, may be required to travel throughout the system in cases of emergencies and storms to restore the system. Will be responsible for all assigned work being done in accordance with all company design standards and work methods. Will be required to prepare all job associated paperwork.

Required Qualifications

  • Commercial Driver's License, Class A
  • Must have satisfactorily completed the FPL apprentice cable splicer or another equivalent recognized program.
  • Must be physically able to do all assigned tasks.
  • Must be able to work in direct sunlight or at night.

Preferred Qualifications

  • Minimum of two (2) years verifiable work experience as a Certified Cable Splicer

Click here to view the full job posting.

Contact

NextEra Energy, Inc.

700 Universe Blvd

Juno Beach

Florida United States

www.nexteraenergy.com


 From the same category : lineman