March 29, 2024

Wind Turbine Icing & Ice Prevention Forum

Organization:
BIS Group
Location:
Berlin, Berlin, Germany
Start Date:
November 6, 2017
End Date:
November 7, 2017
Description
Discover cost-efficient solutions to cut the productivity losses related to wind turbines icing.The sessions are set up to be interactive for the attendees to get involved into the experience-sharing process and to tackle existing problems in real-time discussions

Topics:

  • Discovering the ways to prevent wind turbine icing
  • Discussing the ways to mitigate the negative effects of the wind turbine icing
  • Learning how to overvome icing-related safety issues
  • Gaining an insight on current tools and techniques being applied
  • Learning how to minimize icing-related O&M costs
  • Discussing the technical challenges and strategies of maintenance and service in icing climates
  • Geting an overview of the development perspectives of the existing anti-icing solutions

 Representatives Invited:      

  • CEO
  • Vice Presidents
  • General Managers
  • Directors
  • Heads
  • Researchers
  • Engineers
  • Scientists

 Areas of responsibility:

  • Wind Turbine manufacturing
  • Wind Operation
  • Production
  • Engineering
  • Design
  • R&D
  • O&M
  • Meteorology
  • Cold climate solutions
  • Consultancy
Utility-Grade Touchless Monitoring | Systems With Intelligence